SR 28 (Sunset Highway) Plan
The SR 28 Eastside Corridor Project responds to long-standing traffic problems in the Sunset Highway corridor between the Odabashian Bridge and Downtown East Wenatchee.
• Download the Document (pdf)
The SR 28 Eastside Corridor Project responds to long-standing traffic problems in the Sunset Highway corridor between the Odabashian Bridge and Downtown East Wenatchee.
• Download the Document (pdf)
©2010 Wenatchee Valley Transportation Council
Call: 509.663.9059
Fax: 509.663.2022
300 South Columbia St, Wenatchee, WA 98801