<?xml version="1.0" encoding="UTF-8"?>
<!--Generated by Squarespace Site Server v5.11.5 (http://www.squarespace.com/) on Sat, 31 Jul 2010 07:53:50 GMT--><feed xmlns="http://www.w3.org/2005/Atom" xmlns:dc="http://purl.org/dc/elements/1.1/"><title>North Wenatchee Avenue Corridor Study</title><subtitle>North Wenatchee Avenue Corridor Study</subtitle><id>http://www.wvtc.org/north-wenatchee-avenue-corrido/</id><link rel="alternate" type="application/xhtml+xml" href="http://www.wvtc.org/north-wenatchee-avenue-corrido/"/><link rel="self" type="application/atom+xml" href="http://www.wvtc.org/north-wenatchee-avenue-corrido/atom.xml"/><updated>2010-07-21T18:19:36Z</updated><generator uri="http://www.squarespace.com/" version="Squarespace Site Server v5.11.5 (http://www.squarespace.com/)">Squarespace</generator><entry><title>-</title><id>http://www.wvtc.org/north-wenatchee-avenue-corrido/2010/7/21/please-see-below-meeting-summaries-for-the-sr285-master-pla.html</id><link rel="alternate" type="text/html" href="http://www.wvtc.org/north-wenatchee-avenue-corrido/2010/7/21/please-see-below-meeting-summaries-for-the-sr285-master-pla.html"/><author><name>WVTC Admin</name></author><published>2010-07-21T18:05:41Z</published><updated>2010-07-21T18:05:41Z</updated><content type="html" xml:lang="en-US"><![CDATA[<p>Please see below meeting summaries for the SR285 Master Plan Corridor  Advisory Team and Steering Committee Meetings held on May 27,  2010.&nbsp; ﻿</p>
<p>&nbsp;</p>
<p><a href="http://www.wvtc.org/storage/CAT Meeting 5 Summary 5-27-10.pdf">May 2010 CAT Summary</a></p>
<p><a href="http://www.wvtc.org/storage/Steering Committee Meeting 5 Summary 5-27-10 Transpo edits.pdf">May 2010 SC Summary</a></p>]]></content></entry><entry><title>-</title><id>http://www.wvtc.org/north-wenatchee-avenue-corrido/2010/6/9/click-here-to-open-a-sr285-master-plan-slide-show-that.html</id><link rel="alternate" type="text/html" href="http://www.wvtc.org/north-wenatchee-avenue-corrido/2010/6/9/click-here-to-open-a-sr285-master-plan-slide-show-that.html"/><author><name>WVTC Admin</name></author><published>2010-06-09T23:19:00Z</published><updated>2010-06-09T23:19:00Z</updated><content type="html" xml:lang="en-US"><![CDATA[<p><a href="http://www.wvtc.org/storage/SR285_AllCouncils_Powerpoint.pdf">Click here to open a SR285 Master Plan slide show that will be shown at the June 10th Special Meeting of the Wenatchee Valley Transportation Council. </a><a href="http://www.wvtc.org/storage/SR285_AllCouncils_Powerpoint.pdf">&nbsp;</a></p>]]></content></entry><entry><title>Refined SR285 Corridor Study Alternatives</title><id>http://www.wvtc.org/north-wenatchee-avenue-corrido/2010/6/4/refined-sr285-corridor-study-alternatives.html</id><link rel="alternate" type="text/html" href="http://www.wvtc.org/north-wenatchee-avenue-corrido/2010/6/4/refined-sr285-corridor-study-alternatives.html"/><author><name>WVTC Admin</name></author><published>2010-06-04T18:35:41Z</published><updated>2010-06-04T18:35:41Z</updated><content type="html" xml:lang="en-US"><![CDATA[<p>After another Public Open House at the Confluence Technology Center and additional Community Advisory Team and Steering Committee meetings our original SR285 improvement scenarios have been refined to reflect the input that was received.</p>
<p>Please open these Adobe .pdf documents [below] to view refined and updated improvement scenarios for the SR285 Study.&nbsp; If you have any comments or input please utilize the online comment box on the right side of this page or email us directly.</p>
<p><a href="http://www.wvtc.org/storage/Exhibit_01_ConfParkwayBypassSR285Improvements.pdf">Click here to view the entire Confluence Parkway Map.</a></p>
<p><a href="http://www.wvtc.org/storage/Exhibit_02_EasyStreetInterchangeImprovements.pdf">Click here to view the proposed improvements at the US2/SR285 interchange. </a></p>
<p><a href="http://www.wvtc.org/storage/Exhibit_03_ConceptPackages_EvaluationSheet.pdf">Click here to view criteria ratings for all corridor improvements considered. </a></p>
<p><a href="http://www.wvtc.org/storage/Exhibit_04_PreferredConceptPackages.pdf">Click here to view the three most successful concept packages for consideration by the WVTC Council.</a></p>
<p><a href="http://www.wvtc.org/storage/Exhibit_07_Modify_N_Wenatchee_Details.pdf">Click here to view a detailed map with blow-up examples at key locations of the SR285 Improvements concept.&nbsp; This concept does not include the Confluence Parkway, but instead focuses on optimizing travel within the SR285 Corridor footprint.</a></p>
<p><a href="http://www.wvtc.org/storage/Exhibit_06_ConfluenceParkway_Examples.pdf">Click here to view a detailed map with blow-up examples at key locations of the Confluence Parkway concept.</a></p>
<p>&nbsp;</p>
<p>&nbsp;</p>]]></content></entry><entry><title>-</title><id>http://www.wvtc.org/north-wenatchee-avenue-corrido/2010/3/2/please-see-below-meeting-summaries-for-the-sr285-master-pla.html</id><link rel="alternate" type="text/html" href="http://www.wvtc.org/north-wenatchee-avenue-corrido/2010/3/2/please-see-below-meeting-summaries-for-the-sr285-master-pla.html"/><author><name>WVTC Admin</name></author><published>2010-03-02T19:37:18Z</published><updated>2010-03-02T19:37:18Z</updated><summary type="html" xml:lang="en-US"><![CDATA[<p><a href="http://www.wvtc.org/storage/Project_Schedule_OH02.pdf">Project Schedule</a></p>
<p><a href="http://www.wvtc.org/storage/Exhibit_1A_Transportation Master Plan Purpose and Process Overview_web.pdf">Master Plan Development Process</a></p>
<p><a href="http://www.wvtc.org/storage/Exhibit_3B - Screening Criteria for Short and Long Term Alternatives.pdf">Project Evaluation Criteria</a></p>
<p><a href="http://www.wvtc.org/storage/Other_Improvements.pdf">Regional Improvement Projects (map)</a></p>
<p><a href="http://www.wvtc.org/storage/Other_Improvements_Table.pdf">Regional Improvement Projects (table)</a></p>]]></summary></entry><entry><title>-</title><category term="Easy Street Access"/><category term="Non-Motorized Improvements"/><category term="Transit Service"/><category term="US 2"/><id>http://www.wvtc.org/north-wenatchee-avenue-corrido/2010/2/25/north-of-the-wenatchee-river-roadway-non-motorized-and.html</id><link rel="alternate" type="text/html" href="http://www.wvtc.org/north-wenatchee-avenue-corrido/2010/2/25/north-of-the-wenatchee-river-roadway-non-motorized-and.html"/><author><name>WVTC Admin</name></author><published>2010-02-25T18:39:30Z</published><updated>2010-02-25T18:39:30Z</updated><content type="html" xml:lang="en-US"><![CDATA[<h3><strong>North of the Wenatchee River: Roadway, Non-Motorized, and Transit Concepts</strong></h3>
<p><a href="http://www.wvtc.org/storage/North Package Overview 02.04.10.pdf">North Concepts Overview (Table)</a></p>
<p><strong>Concept 1: Realign US 2</strong></p>
<p>&bull; <a href="http://www.wvtc.org/storage/documents/2010/Concept01_NM-T_email.pdf" target="_blank">Exhibit N-1N (Non-Motorized and Transit Map)<br /></a></p>
<p>&bull; <a href="http://www.wvtc.org/storage/documents/2010/Concept01_R_email.pdf" target="_blank">Exhibit N-1R (Roadway and Intersection Map)<br /></a></p>
<p><strong>Concept 2: Modify US 2/Easy Street Access&nbsp;</strong></p>
<p>&bull; <a href="http://www.wvtc.org/storage/documents/2010/Concept02_NM-T_email.pdf" target="_blank">Exhibit N-2N (Non-Motorized and Transit Map)<br /></a></p>
<p>&bull;&nbsp;<a href="http://www.wvtc.org/storage/documents/2010/Concept02_R_email.pdf" target="_blank">Exhibit N-2R (Roadway and Intersection Map)</a></p>
<p>&nbsp;</p>
<p><a href="http://www.wvtc.org/storage/Exhibit_3A-2_Types of Improvements_web.pdf">Types of Improvements Examples</a></p>]]></content></entry><entry><title>-</title><category term="Non-Motorized Improvements"/><category term="Transit Service"/><category term="access"/><category term="bypass"/><id>http://www.wvtc.org/north-wenatchee-avenue-corrido/2010/2/24/south-of-the-wenatchee-river-roadway-non-motorized-and.html</id><link rel="alternate" type="text/html" href="http://www.wvtc.org/north-wenatchee-avenue-corrido/2010/2/24/south-of-the-wenatchee-river-roadway-non-motorized-and.html"/><author><name>WVTC Admin</name></author><published>2010-02-24T23:29:00Z</published><updated>2010-02-24T23:29:00Z</updated><content type="html" xml:lang="en-US"><![CDATA[<h3><strong>South of the Wenatchee River: Roadway, Non-Motorized, and Transit Concepts</strong></h3>
<p><a href="http://www.wvtc.org/storage/South Concept Overview 02.04.10.pdf">South Concepts Overview (Table)</a></p>
<p><strong>Concept 3: Reconfigure Access with Increased Circulation Routes</strong></p>
<p>&bull; <a href="http://www.wvtc.org/storage/documents/2010/Concept03_NM-T_email.pdf" target="_blank">Exhibit S-3N (Non-Motorized and Transit Map)<br /></a></p>
<p>&bull; <a href="http://www.wvtc.org/storage/documents/2010/Concept03_R_email.pdf" target="_blank">Exhibit S-3R (Roadway and Intersection Map)<br /></a></p>
<p>&nbsp;<strong>Concept 4: Traffic Bypass</strong></p>
<p>&bull; <a href="http://www.wvtc.org/storage/documents/2010/Concept04_NM-T_email.pdf" target="_blank">Exhibit S-4N (Non-Motorized and Transit Map)<br /></a></p>
<p>&bull; <a href="http://www.wvtc.org/storage/documents/2010/Concept04_R_email.pdf" target="_blank">Exhibit S-4R (Roadway and Intersection Map)</a></p>
<p>&nbsp;</p>
<p><a href="http://www.wvtc.org/storage/Exhibit_3A-2_Types of Improvements_web.pdf">Types of Improvements Examples</a></p>]]></content></entry></feed>