    Please see below meeting summaries for the SR285 Master Plan Corridor Advisory Team and Steering Committee Meetings held on May 27, 2010.  

     

    May 2010 CAT Summary

    May 2010 SC Summary

    Wednesday
    Jun092010

    Friday
    Jun042010

    Refined SR285 Corridor Study Alternatives

    After another Public Open House at the Confluence Technology Center and additional Community Advisory Team and Steering Committee meetings our original SR285 improvement scenarios have been refined to reflect the input that was received.

    Please open these Adobe .pdf documents [below] to view refined and updated improvement scenarios for the SR285 Study.  If you have any comments or input please utilize the online comment box on the right side of this page or email us directly.

    Click here to view the entire Confluence Parkway Map.

    Click here to view the proposed improvements at the US2/SR285 interchange.

    Click here to view criteria ratings for all corridor improvements considered.

    Click here to view the three most successful concept packages for consideration by the WVTC Council.

    Click here to view a detailed map with blow-up examples at key locations of the SR285 Improvements concept.  This concept does not include the Confluence Parkway, but instead focuses on optimizing travel within the SR285 Corridor footprint.

    Click here to view a detailed map with blow-up examples at key locations of the Confluence Parkway concept.

     

     

    Tuesday
    Mar022010

    Please see below meeting summaries for the SR285 Master Plan Corridor Advisory Team and Steering Committee Meetings held on February 10, 2010.  Also, included at the end of the summary is concept package descriptions detailing the improvement schemes reviewed during these meetings.

    February 2010 CAT Summary

    February 2010 SC Summary

     

     

    The SR285 Master Plan Open House #2 was held on February 25th, 2010 from 5:00-8:00pm at the Confluence Technology Center in the Olds Station business park near Wenatchee.  Attendance was good at the event and significant feedback was recorded from the break-out sessions in this more intensive second Open House event.  Please see the link below for a summary of the event and a compilation of comments received.

    Open House #2 Summary

     

    Background Information

    Project Schedule

    Master Plan Development Process

    Project Evaluation Criteria

    Regional Improvement Projects (map)

    Regional Improvement Projects (table)

    DRAFT Market Assessment for the Wenatchee Valley Area

    Thursday
    Feb252010

    North of the Wenatchee River: Roadway, Non-Motorized, and Transit Concepts

    North Concepts Overview (Table)

    Concept 1: Realign US 2

    Exhibit N-1N (Non-Motorized and Transit Map)

    Exhibit N-1R (Roadway and Intersection Map)

    Concept 2: Modify US 2/Easy Street Access 

    Exhibit N-2N (Non-Motorized and Transit Map)

    • Exhibit N-2R (Roadway and Intersection Map)

     

    Types of Improvements Examples