Metropolitan Transportation Plan > MTP Interactive Web Map
Performance Measures for Unconstrained Project Evaluation - this was passed out at the September TAC Meeting and will be used as a structure to evaluate the fiscally unconstrained MTP projects.
Unconstrained Project Evaluation Matrix - this was also passed out at the September TAC Meeting, it shows all the projects or 'scenarios' to be evaluated in the unconstrained portion of the MTP.
Sunset Highway .pdf - this shows the complete SR28 staging plan from the Susnet Highway EIS. There are more maps and information available at the following web links.
Cascade IC Project Page - http://www.wsdot.wa.gov/projects/sr28/jctus2_97to9thststage2/
Sunset Corridor Study Page - http://www.wsdot.wa.gov/projects/sr28/wenatcheeeastsidecorridor/
SR285 Plan .pdf - this is the complete preferred alternative from the SR285 Transportation Master Plan.
SR285 Plan Page - http://www.confluenceparkway.org/
MTP Update Interactive Web Map
Use this web map to view the location of projects to be evaluated in the unconstrained portion of the MTP in preparation for TAC. The only projects shown on the map at this time are the transit scenarios, Hawley Street Grade Separation, and the Columbia River Bridge, as they do not have detailed design graphics yet.
